Project Description

Description

Considering the increase in energy consumption and in order to prevent blackouts during peak load in Zahedan city, Pishgaman Sanat Bargh Tehran Company was selected as a tender, constructing a 230/63 kV substation east of Zahedan on a land with an approximate area of ​​62,500 square meters and with a one and a half key arrangement in the 230 kV section with 6 feeders, the output is 63 kV and the transmission power is 320 MVA as EPC. Despite the great difficulty in the progress of the project, it was successfully put into operation in February 2017 with the unremitting efforts of all those involved.