Project Description

Description

According to the plans made in order to operate the rehabilitation and steel factories of the Iranian Butya Steel Complex and the construction of a 450 MW combined cycle power plant and consequently the need to increase the level of energy exchange with the national electricity network, Pishgaman Sanat Bargh Tehran Company in order to achieve the drawn horizon, the above complex was established with the construction of a 230 kV Kerman-Zarand dual-circuit power transmission line with a length of 8 km and the development of a 230 kV Persia switchboard (two complete one-and-a-half switches) and eventually was appeared as an elevated EPC in 2019.